Home Products Double Girder Semi Goliath Crane
Semi Goliath Crane

Double Girder Semi Goliath Crane

Hybrid crane: one end runs on an elevated gantry rail on your building column, the other on a leg travelling on a floor rail. Perfect for extending crane coverage into bays where overhead rails exist on only one side. Up to 40 Ton capacity, IS:3177 design.

Capacity5 – 200 Ton
SpanUp to 50 m
Lift HeightUp to 30 m
Hoisting SpeedNormal: 2 – 3 MPM
VVFD: 0.3 – 2.5 MPM through VVFD Drive
CT SpeedNormal: 10 – 12 MPM
VVFD: 1.7 – 12 MPM through VVFD Drive
LT SpeedNormal: 15 – 18 MPM
VVFD: 1.5 – 15 MPM through VVFD Drive
Elevated SideEnd carriage on gantry rail
Floor SideA-frame leg on CR rail
HoistCrab winch unit
ControlPendant / Radio Remote
Duty ClassClass II / III
StandardsIS:3177 · IS:807
Technical Details

Built To Standard, Tested Beyond It

Sync DriveMatched LT speeds both sides
Floor RailCR-60 embedded / surface
Leg DesignBraced A-frame
Skew ControlGuide rollers + VFD
Testing125% SWL load test
ErectionLive-plant installation possible
Wind RatingIS 875 for outdoor bays
CantileverOptional one / both sides
The ETC Quality Promise
  • 125% SWL load test before every dispatch, documented & stamped
  • IS:2062 tested plates with mill certificates on file
  • IS:3177 / IS:4137 / FEM 1.001 compliant design calculations
  • Stress-relieved fabrication at critical welded joints
  • ISO 9001:2015 certified manufacturing process
About This Product

Engineered For Indian Industry

Semi Goliath cranes solve an awkward but common problem: one side of the bay has a crane rail on building columns, the other side has nothing — an open yard, a lean-to, or a newer extension. Rather than build a full second runway, the crane's far end simply rides a floor rail on its own leg.

The engineering challenge is keeping both ends synchronised; ETC uses matched geared motors with VFD control and guide rollers so the bridge tracks true without crabbing. Installation typically happens without stopping your existing operations.

Rail on one side only?

Send bay photos and column details — we confirm the semi-goliath layout and quote in 24 hours.

Key Features
  • Half the civil cost — one elevated rail only
  • Extends existing bays — into yards and lean-tos
  • Synchronised drives — no skew, no rail wear
  • Live installation — minimal production loss
  • Custom leg heights — clear existing machinery
  • 125% load tested — with certificate
Applications

Where This Machine Earns Its Keep

Steel & Rolling Mills
Billet handling, coil movement and furnace charging in continuous duty cycles.
Fabrication Workshops
Positioning heavy weldments and machined assemblies with precise inching control.
Foundries & Forging
Ladle handling and die movement engineered for heat and dust environments.
Warehousing & Logistics
Fast, safe loading and unloading across storage bays and dispatch yards.
Infrastructure Projects
Precast segment and girder erection at bridge, metro and dam sites.
Power & Energy Plants
Turbine hall maintenance cranes built to strict duty classifications.
Safety First

Safety Features As Standard

Overload Limiter

Electronic load cell cuts hoisting the moment load exceeds rated SWL.

⬆ Upper/Lower Limit Switches

Rotary geared and counterweight limits stop hook over-travel in both directions.

Motion Warning Hooter

Audible alarm and flasher warn floor staff during LT/CT travel.

Fail-Safe DC Brakes

Electromagnetic brakes engage automatically on power failure — load holds instantly.

Pendant + Radio Remote

IP-65 push-button pendant with optional wireless remote and emergency stop.

Panel Protection

SPP, overload relays and single-phase preventers protect motors and VFDs.

FAQ

Questions Buyers Ask Us

Twin girders carry a crab winch unit for higher capacity, greater hook lift and continuous duty, while still needing a floor rail on one side only — the practical answer when heavy loads must be handled beside an existing building line.

A crab winch unit with machined drum, true vertical lift reeving and fail-safe braking runs on rails atop the girders, giving full span coverage with cabin, pendant or radio control.

Load is shared between the elevated runway and the floor rail, so foundation loads on the leg side are lower than a full gantry of the same capacity — often saving significant civil cost.

Class II and Class III duty are standard, with mechanisms classified per IS 3177 and FEM 1.001 against your lifts per hour and average load spectrum.

Yes. For yards and partly open bays we add wind-load design to IS 875, storm clamps on the floor rail, weatherproof IP-rated panels and a UV-stable PU topcoat over epoxy primer.

The runway can be extended by adding rail and re-anchoring; relocating the leg line changes the span, which is a structural redesign. It is far cheaper to plan the final rail length at the start.

Most double girder semi goliath cranes are erected, laser-aligned and commissioned within 5–8 days once the floor rail and elevated runway are ready.

Send us your shed drawing or photographs of the existing gantry girder and columns. We check the runway capacity against the calculated wheel loads and tell you honestly whether it will carry the crane or needs strengthening.

Reviews

What Users Say

Rate This Product
Explore More

Similar Products

Product Enquiry

Get A Quotation For Semi Goliath — Double Girder

Answer a few quick questions and our team will prepare a detailed techno-commercial quotation within 24 hours.

About The Requirement

About You

Your details go only to the ETC sales team — never shared, never spammed.

Ready To Buy A Double Girder Semi Goliath Crane?

Send your capacity, span and lift height — a detailed techno-commercial quotation reaches you within 24 hours.